Works inlcude-installation of flexible membrane to all floors in main house and east wing
house.Porcelain tiling to 6 bathrooms (walls and floors)in main house, slate tiling to student kitchen area and corridor.
Marble tiling to three bathrooms in east wing of the house, Black granite worktops manufactured and installed to kitchen in
mainhouse, Porcelain tiling to swimming pool area with mosaics installed to pool floor and walls.