University College London Hospital

Work included: design supply and install 600m2 black granite to stallrisers to entire building. Stone was installed using mechanical fixings. Prior to fixing the stone Janatti undertook the insulation package, Janatti supplied and installed 600m2 50mm thick installation prior to fixing stone. Janatti supplied and installed 565m2 flame textured granite paving to external areas, this included ramps, access panels. Janatti undertook the silicone package to all external stonework.
Stallrisers ranged from 1000x1000 to 1000x200 due to different levels around the building. Granite to paving were 600 x600 all materials were 30mm thick