Works consisted of floor preparation. JMGT undertook the plywood contract prior to tiling. Plywood was installed and
primed ready for limestone tiles. Limestone tiles installed throughout bar area and to ramps (85m2). Steps and ramps formed
from slabs. Jmgt also manufactured a complete limestone bar including walls,aprons,soffits and bar tops. Ramps walls also
manufactured and installed in limestone.
Works completed in 4weeks