Works consisted
Restaurant and
Bar Area- cleaning and restoring the impressive marble entrance to the grand hotel. 1000m2 of bookmatched marble was
heavily cleaned, repaired, waxed and repolished. Many stones were loose and dangerous so Jmgt re-fixed stones and repaired
the stones where possible. 2 new walls (60m2) were manufacture in bookmatched arabescato marble with bardiligio borders and
belgian black skirting. The flooring in the new bar area was white carrera marble with belgian black borders. All the belgian
black marble was heavily damaged and all was replaced. 50 white carrera tiles were manufactured and installed and floor was
repolished to match entrance way. Granite bar tops were manufactured and installed by Jmgt.
Ballroom and Bathrooms- 40 marble columns were heavily stripped back to their former beauty and cleaned and
repaired. 87 new stones had to be manufactued from verde tinos and installed to columns where stone had completely
eroded. 10 new Vanity units installed to new bathrooms and 49 cistern tops all removable were manufactured in impala granite
and installed by jmgt.
All marlbe in entrance and dinning hall was all cleaned,repaired and repolished to a high finish.