works consisted of-manufacturing and installing over 700m2 of relvinha limestone (900 x 600 x 30) to walls and floors
on the 3rd,4th and 4th floor. A flexible membrane was supplied and installed to all floors prior to tiling. manufacture and
install 30m2 unfilled travertine (900x150 x 20) to reception feature wall.Manufacture and install 40m2 jura limestone to 4th
floor feature wall ( limestone had a chiselled face effect). supply and intall 50m2 to different kitchen and break out areas
on the 5th floor.
works were completed in 8 weeks