12th floor Portland House

Works inlcude-
Supply and install 170m2 Porcelain 400x 400 tiles to reception floor and toilet cores.
Supply and install 30m2 Screed to disabled toilet floor and lift entrance floor.
Manufacture,supply and install 48m2 Pyrock boarding to reception floor (floor prep).
Install Waterproofing membrance to Shower walls and floor.
Supply and install 40m2 Mosaic tiles to disabled shower room.
Suppply and install 12m2 Porcelain tiles to disabled shower room floor.
Manufacture and install 50m2 Porcelain skirting to Toilet cores (Skirtings made from tiles)