Sidcup Hard Landscaping

Duration 7weeks
Works included installing all limestone to paveways, main patio area and all walkways and steps. Steps and risers all created on site through the use of wet saw and a nosing was created on steps once installed.
 The risers were cut from the slabs and 15 holes were core drilled into the stone to create an opening for lights and other fixtures. Air vent holes also created into the risers.