Arsenal FC HQ

Below are photographs which have be taken of completed works at Arsenal.

ddscf0026.jpg

ddscf0028.jpg

ddscf0025.jpg

Limestone paving to full and half Landings (ten in total) on main staircase.Bespoke setting out to landings, material used 900x300, 900x500 and 900x 900 20mm thick Jura Beige. Limestone treads installed with two non-slip strips inserted (128 Treads and 256 strips installed).
 
 
 
dscf0033.jpg
60m2 of Jura limestone (900x900, 900x500 and 900x300)was installed to the entire entrance of the ground floor. The material was installed on a thick bed of sand and cement.

dscf0029.jpg

50m2 of Kirstone cladding installed to main lift wall. All stones were fixed using specialist hidden fixings. All stones were bookmatched.

dscf0030.jpg

dscf0031.jpg

dscf0032.jpg

ddscf0024.jpg

ddscf0021.jpg

dsc00012.jpg

dsc00011.jpg

dsc00006.jpg

dsc00009.jpg

imagee03.jpg

counterdscf00.jpg

arsenal.jpg

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Limestone was installed to many different areas of the building including fourth floor corridor, landing areas to staircase, toilet lobby's (to meet with black ceramic tiles), lift carts, ground floor, bar area and serving areas. 200m2 of Limestone installed in building to floors.

Arsenal_Toilet_2.jpg
Arsenal_Toilet_2.jpg
Arsenal_Toilet_2.jpg

300m2 Ceramic tiles installed to male and females toilets levels 1-4. 4th floor toilet corridor tiled in ceramic.