Arsenal FC HQ

Works are in progress.
          Phase 1- Works include supplying and installing ceramic tiles to floors in numerours locations on floors 1-4. Matching skirtings also supplied and fitted to match tiles (300m2).
        Phase 2-Works include supplying, and installing mosaic sheets to sink splashbacks and white ceramic tiles to t-points in kitchen areas.
        Phase 3- Works include supplying, manufacturing and installing 128 Jura Limestone treads to main staircase.
        Phase 4- Works include supplying, manufacturing and installing Jura limestone paving to all landing areas (ground floor to 4th floor) and corridors and main floor areas in front of lifts.
        Phase 5- Works Include suppyling, manufacturing and installing Jura limestone paving to lift areas and lobby's to toilet cores.
        Phase 6- Works include supplying, manufacturing and installing Kirkstone slabs to main lift wall.

Counter and Bar Tops
 
Jmgt were contracted to manufactured and install marble to the fourth floor bar and food counters.