The Plaza

Location-Shaftesbury Avenue 
Duration-8weeks (installing)

Works consisted of manufacturing, supplying and installing marble to walls, floors and toilet area. 560m2 installed in total.

plaza1.jpg

plaza3.jpg

Two staircases consisting of 84treads were manufactured and installed.