Consisting of Supplying, Installing, and Manufacturing. The contract was to fix 51 stones which were 1000mm x 800mm
and 40mm thick to the outside of 151 Wardour Street between fifth and sixth floors. The building was listed and the new material was to be a match as close
as the existing. The stones were fabricated to achieve a bookmatch pattern (the viens in the Onyx joined to form their natural
pattern). This made this project longer than a normal project as every piece cut from a slab had to be match and labelled. All
stone were fixed using stainless steal hidden fixings. The joints were finished with a waterproof silicone. The stones
were fixed within three weeks.
Stones installed from scaffolding |

|
Two panels bookmatched |

|
All panels bookmatched in pairs |

|
Picture taken after a few days of fixing |

|
Picture taken Half way through fixing |

|
Works after 1week of installing |

|