Works consisted of Supplying, Manufacturing, polishing, templating, installing natural stone.
Location:The dorchester Hotel Park Lane
Total Time:7weeks
Works consisted of supplying , manufacturing and installation of three new floors. One main staircase was
fabricated off site and then fitted.
Old marble and stone was repaired and refurbished.