BP Uxbridge1

Location- Uxbridge
Time-8weeks

Consisting of supplying, manufacturing, and installing. Janatti supplied over 700m of granite. All the materials supplied were cut by our factory team to suit patterns and shapes. All the floor was laid on a thick bed of sand and cement and a site supervisor from Janatti was on site at all times. The granite work was carried out within a very  tight time budget of 8weeks as the building was fully occuppied throughout the works.