Works consisted of Supplying, Maufacturing, Installing, Cleaning, Polishing.
The works constisted of installing many different floors on sand and cement. The floors had different
setting out points and most of the floors had a border. The main reception was installed (floor and desk
and steps) the entire lift carriages were tiled in the same pattern and all the walk ways to the lifts.Janatti manufactured
counter tops, vanity units and steps.
Janatti grouted and sealed all the areas and polished the nosing of the steps on site. Janatti then
were handed a year contract of cleaning all the floors laid(1995).




Devon House/ Ivory House
A huge fit out of bathrooms and liftcarts
in marble, ceramic and granite tiles the rooms also included marble vanity units. Works started early 2006 and are still commencing.Works
including bathroom fit outs of wall and floor tiling in every room, kitchen floors and balconies . Marble and granite tiling
to match existing material in lift carts (ten in total).



Awaiting pictures of other lift carts and the bathroom fit outs.