75 King William Street

Works include

  • Supply and install 380m2 of plyowood prior to granite installtion. 
  • Supply and install ditra matting to 380m2 floor prior to granite installation.
  • Manufacture and install 380m2 honed black granite to ground floor and 3rd floor.
  • Manufacture and install 200lm honed black granite skirtings.
  • Suppy and install 100m2 porcelain tiles to toilet cores.
  • 60m2 bespoke slate cladding to lift walls.
  • Granite tiling to lift carts
  • Granite steps and ramps manufactured and installed.

GROUND FLOOR ENTRANCE
Installation of plywood and ditra matting prior to granite installation.
Black granite to skirting and flooring and lift carts. Bespoke island stone to lift lobby walls.

kingww.jpg

DSCF0084.JPG
DSCF0084.JPG
DSCF0084.JPG
DSCF0084.JPG

3RD FLOOR ATRIUM
Installation of plywood prior to black granite installation to flooring.

kingww.jpg

Photo0028_1_.jpg
Photo0028_1_.jpg

TOILET CORES

Latexing to floors prior to riven porcelain installation, porcelain skirtings installed to all walls and cubicles

DSCF0079.JPG
DSCF0079.JPG
DSCF0079.JPG

EXTERNAL ENTRANCE
Flame textured black granite paving and steps installed, honed black granite installed to hand-rail kerbs. Stainless steel installed to nosing and non slip feature to steps