jmgt-design1.jpg
HomeAbout UsStone ServicesRestoration & MaintenanceCompleted ProjectsGeneral Building WorksContact Us
Club Quarters Hotel 2010/2011 works

After a huge restoration in 2008/2009, janatti were contracted to carry out more restoration works in 2010/2011. Works include repairs to external steps-heavily clean steps and external foyer and reapir damage. Template,manufacture and install 15 white carrera tiles (cut from slabs due to old flooring being an unusual shape and size) to main entrance flooring and polish surrounding floor to match existing. Template,manufacture and install 35 thassos tiles to laminated panels and polish surrounding floor. Template,manufacture and install 35 belgian black and thassos florrets and polish surrounding floors.Template,manufacture and install red/maroon marble triangles to floor and border strips and polish surrounding floor(the original material is no longer available so Janatti found a material to match as closely as possible). 30m2 of entrance flooring was badly worn, Janatti undertook the regrouting and regrinding and polishing of the floor. Every joint was cut out using specialist wet fed machines and polished. All works were carried out at different times (at night/early mornings/evenings etc) to save disruption to the hotel.

Granite steps and foyer before cleaning and repairs taken out.

clubqlondon.jpg

Badly damaged Laminated panels before Janatti commenced

Photo0244.jpg
SDC10220.JPG
SDC10220.JPG
SDC10220.JPG
SDC10220.JPG

Finished area

SDC10220.JPG
club-quarters-trafalgar-square-london-reception.jpg
club-quarters-trafalgar-square-london-reception.jpg